Mine to metal,
made in Australia.
Castile Resources is developing the Rover 1 Project in the Northern Territory, producing gold doré, 99% copper, 99% cobalt and 96.5% magnetite as finished downstream products.
Rover field assets,
plus Warumpi.
Castile's portfolio is anchored by the Rover Project in the Rover Mineral Field, with Rover 1, Explorer 108 and Explorer 142 sitting within that field, plus the separate standalone Warumpi Project in the West Arunta.
Rover 1
A high-grade Iron Oxide Copper Gold polymetallic asset. Modelled in the 2022 PFS as an underground operation with a 500,000 tpa processing plant. Designed for downstream production of finished metals — fully in Australia.
Headline economics,
plain sight.
From the 2022 Pre-Feasibility Study. The Bankable Feasibility Study now underway will refine these figures using updated commodity pricing and an expanded resource.
Ambient Noise
Tomography.
Castile completed a successful proof-of-concept passive seismic survey over Rover 1, applying ambient noise tomography algorithms to the Jupiter Ironstone, part of the Rover 1 deposit.
The result: ANT can accurately discriminate ironstone bodies at depth, opening up a new class of drill-ready targets across the Rover Mineral Field without traditional active-source seismic.
Watch the ANT video