Video
Rover 1 Project Video
Rover 1 Project Video
Castile Resources is developing the Rover 1 Project, a high-grade Iron Oxide Copper Gold deposit in the Tennant Creek region of the Northern Territory. The project is positioned to produce gold doré, 99% copper, 99% cobalt and high-grade 96.5% magnetite.
Rover 1 videoPFS completed 5 December 2022Initial mine life over 8 years
Project Summary
Flagship video overview.
The Pre-Feasibility Study models an efficient underground mining operation with a modern 500,000 tonnes per annum processing plant, specifically designed to produce high-value gold, copper, cobalt, and magnetite products.
The PFS projects a strong economic outlook, including a pre-tax NPV of A$451.7 million at a 6.5% discount rate and an IRR of 46%, based on an initial mine life of more than eight years.